Main menu

  • Map showing the various work locations of VL No. 51

Various Locations Pavement Renovation and Sewer Replacement No. 51

San Francisco Public Works has contracted with R&S Construction, Inc. to install new sewer utilities and renovate the roadway at various locations in San Francisco District 3 as part of the Various Locations Pavement Renovation and Sewer Replacement No. 51 Project. 

Work locations include:

  • Jackson Street (Columbus to Custom House and Battery to Drumm) 
  • Walter U Lum Place (Washington to Clay)
  • Security Pacific Place (O'Farrell to End)
  • Sabin Place (California to End)
  • Joice Street (Clay to Pine) 
  • Parkhurst Alley (Clay to End)
  • Anson Place (Powell to End)
  • Mason Street (California to Pine and Pine to Bush)
  • Himmelmann Place (Broadway to Pacific)  
  • Leroy Place (Sacramento to End)
  • Trader Vic Alley (Cosmo to Post)
     

Work will consist of pavement renovation, curb ramp construction, sewer replacement, AWSS work, traffic control, and all related work. Sewer work will involve some street excavation to install new utilities and will be followed by pavement renovation (i.e. grinding and paving) activity once all utility work is complete. No interruption of sewer service is expected during construction. There may be a delay between utility work and final roadway renovation activity.

The typical sequence of sewer work is to install the new sewer main along the block(s) followed by sewer lateral replacement. Once the sewer main has been installed, Public Works’ engineering team will review video of the sewer laterals to determine which, if any, need to be replaced. The sewer laterals are the connection between the main and the sidewalk/curb. Crews will then schedule the sewer lateral replacement work. Sewer laterals are replaced on an as-needed basis depending on the condition of the line. Sewer service will not be interrupted during construction. Please continue to use your household plumbing as usual. 

During construction, traffic control will be implemented and "No Parking/Tow Away Zone" signs will be posted in active work areas. Local access for Residents, Deliveries and Emergency Services will be provided at all times during work hours. Please limit your use of the roadways within the construction work areas during working hours for the safety of the public and our employees, and to park in driveways or on adjacent blocks when No Parking Zones are posted. Should you need access to your property during work hours, please alert a crew member on site and note that there may be a slight delay to enter or exit your property to allow for crews to create a safe path of travel. Please follow instructions from crew members and follow all posted detour signs.

 

(*Please note:  Construction schedules, dates and durations are estimates subject to change due to rain, equipment breakdown, unforeseen field conditions, existing utility conflicts, crew availability, or early/delayed completion of work at a prior location.)

Pavement and Sewer Renovation
STATUS Completed
District
Completion Date November 30, 2022
Budget
$1,500,000
Project Manager
Ramon Kong, 628-271-2581
Project Team

R&S Construction Management, Inc.
San Francisco Public Works
San Francisco Public Utilities Commission

Contact
Grace L. Moore, Public Affairs
Phone
628-271-2246